Class : ABS
Notation : +A1 Column Stabilized Unit, Accommodation Service, Crane
Service, UWILD
Main Deck
Length : 80m
Width : 70m
Pontoons
Length : 118m
Width : 15m
Survival condition : Hs=12.0m
Hotel Operation condition : Hs=6.0m
Transit condition : Hs=3.0m
Sea water temperature : 0°C to 32°C
Outside air temperature : 0°C to 40°C
Structure design
temperature : -10°C
Fatigue life : 20 years
Transit Draught : 7.8m
Hotel/Crane Draught : 23m
Survival Draught : 20m
Fresh Water : Approx 2100 m³
MDO : Approx 1800 m³
Endurance : 58.3 days with
90% bunkers, 3x engines in 89% load/ Deck Load
Net Deck Area : 2000m²
Port Hull Deck Load : 3 ton/m²
STBD Hull Deck Load : 3 ton/m²
Hotel Variable : 5000 mT @23m
Operational Draft
Crane Variable : 2970 mT @23m
Crane Draft
Survival Variable : 5000 mT @20m
Survival Draft
Transit Variable : 5000 mT @7.8m
Transit Draft
500 PoB : 1-Man Cabin : 2
: 2-Man Cabin : 15
: 3-Man Cabin : 68
: 4-Man Cabin : 66
Mess room : 312 persons
Food in Provision Rooms : 8 days for 500 man (or
layout refrigerated on main deck up to 45 days)
Main Generator : 4 x 1825 kW
Emergency Generator : 1 x 1300 kW
F. W generator : 3 x 70 tones/day
Sewage Plant : 2 x 270 man capacity
vacuum type
OFFSHORE
Main Hook : 1x 1,100ton
Fixed Lifting Max. Capacity: 1,100T@18m~36m
Slewing 360° lifting capacity: 600T~51.1m
Max.Lifting height : Approx 79m above
sea level at 23m draft
Auxiliary hook : 1 x 200tons
Slewing lifting capacity : 200T @ 22.4~84m
Max. Lifting height : Approx. 94m above
sea level at 23m draft
Deck Crane : 1 x 25T @ 10m, 10 T @
30 m (Diesel-Hydraulic, A-Frame, with Man Ridding
certification)
: 2 x 10T @ 25m (Provision
Crane)
Gangway : 1 x Telescopic hydraulic
gangway with base of approx 36.5m ( 6m) length
12 Point Mooring System : 12x Single Drum winches
Pre-lay mooring mode : Water depth 200m up to;
1000m 12 mooring lines
Anchor mooring mode : Water depth from 35m to;
200ml 12 mooring lines
12 sets mooring lines : Each steel wire @76x2500,
breaking load (MBL) 5000KN
Anchor : 12 x 15T anchors and
2 x15T Spare Anchors
Towing : 4 x SMIT Tow Brackets
Tugger Winches : 8 sets
Bollard : 8 sets